Concrete Stair Retrofit

This exterior stair was formed over the top of an existing concrete stair sandwiched between masonry walls


By by David Odell March 6, 2018
This article first appeared in the March 2018 issue of Pro Remodeler.

This project came about because an electrical meter at the top of the exterior concrete stairs didn’t have the required 3 feet of standing space in front of it. Our solution was to extend the top landing 18 inches and form new treads and risers right over the existing stair, which was sandwiched between the stucco wall of the house and a masonry retaining wall. Total width of the stairs was a little more than 4 feet, with 12-inch-deep treads and a 7¼-inch rise. For forms, we ripped 2x8s to 7 inches, which would provide a gentle slope on the treads for positive drainage.

Layout 

I started the layout at the top of the stairs, using a level to extend a horizontal line on the stucco wall to mark the new location of the extended landing [1]. After marking a point 18 inches out from the existing landing, I struck a plumb line to mark the location of the first riser, then measured down 7¼ inches and struck a level horizontal line to mark the top tread. On that line, I marked the tread depth at 12 inches, and dropped another plumb line for the second riser, [2] then repeated the process for each tread and riser all the way to the bottom of the stair.

Next, we marked locations for rebar about a quarter of the distance in from each end of the treads. My son, Tyler, drilled ⅜-inch pilot holes, then drove 8-inch-long steel dowels about 4 inches deep into the existing treads. These will eventually be used to tie rebar in both directions.

While Tyler worked on the rebar pins, I got some help from my other son, Tim, transferring the layout of each tread to the opposite wall. After leveling across at each tread, I measured and marked the layout using the same process as before. [3] 

Setting the Forms

With no way to use stakes to hold the risers in position, we ripped 7x7-inch plywood brackets and attached them to the ends of each 2-by riser. These would be fastened to the walls on either side with 5/16-inch-diameter Tapcons to hold the forms in place. On the stucco wall, we were careful to use screws that would penetrate no more than ¾-inch—long enough to hold the forms in place, but short enough to avoid damaging the drainage paper behind the stucco.

The ¾-inch-thick plywood brackets also saved on lumber: With a stair width of about 49½ inches, we were able to cut 12-foot-long 2x8s into three 48-inch pieces, and the plywood attached to each end made up the other 1½ inches.

We fastened the brackets to both ends of each 2x8 riser form, then cut the riser into two pieces. This solves two problems caused by the fact that the stairs are sandwiched between walls on both sides. First, when setting the forms, it makes it easier to jockey them into position [4]. Once we have them where we want them, we hold them together with a gusset made from wooden stakes screwed over the joint on the outside of the form [5].

The other problem this split-form solves appears after the concrete is poured, when we can remove the gussets and strip the forms without damaging the still-wet concrete. 

To avoid having to change bits, we used three drills: a hammer drill to predrill the block wall, a cordless drill to predrill the stucco, and a second cordless to drive the Tapcons.

A 2-by runner down the middle of the forms provides both bracing and a place to stand while floating the concrete [6]. The final step before the pour is to tie rebar to the steel dowels in both directions and use a rag to rub release oil onto the forms (the used motor oil I save from my truck works well for this purpose). 

Placing and Finishing

The morning of the pour, I used an inexpensive pump-up sprayer to apply QuickCrete Concrete Bonding Adhesive to the existing concrete stair and the rebar, being careful not to spray any on the forms. For this stair we used a pump to place 3,000 psi concrete at about a 4-inch slump into the forms. I added fibermesh to the mix and because the stair is located on a side of the house that gets lots of wind with no sun, I also added 1% polar set to help speed curing in cooler temperatures. 

I floated each tread, starting at the bottom and working my way up the stair [7]. As the concrete began to firm up, I started at the bottom again, removing excess concrete and using a 12-inch square trowel to smooth and shape the tread surface, making sure to slip the trowel underneath each riser [8]. I also used a hand edger to define the nosing where the tread meets the form.

When the concrete was ready for finishing, Tyler removed the screws from the gussets and brackets, starting at the top and working down. I followed, removing the forms and, working from knee-boards on one tread at a time, and using a ½-inch cove tool to finish the inside corner and a ½-inch edger to finish the nosing [9].

The final step was to make a second pass with a broom to create a nonslip surface [10]

Get more Jobsite Know-How here


This article was adapted from the video “How to Build and Pour Concrete Stairs”; an early version by David Frane first appeared on Protradecraft.com.


written by

David Odell

David Odell operates Odell Complete Concrete, a second-generation company in the Los Angeles, Calif. area. David works alongside his sons, Tim and Tyler, who also help him share his 30 years of experience by producing video for the company’s YouTube channel.


Add new comment

Plain text

  • No HTML tags allowed.
  • Web page addresses and email addresses turn into links automatically.
  • Lines and paragraphs break automatically.
leaderboard2 - default

Related Stories

How to Retrofit Foundation Footings

To make a low-height basement a more comfortable living space, this remodeler digs deeper but needs to add support to do so

6 Must-Knows for Installing Pocket Doors

Save your sanity: Do it right the first time

Crawl Spaces to Basements: Proceed with Caution

Converting a crawl space to other uses can upgrade a home and add significant value, but when done incorrectly, it can also be disastrous 

You Need to Talk About It: Mental Health in Construction

Men in the construction industry die by suicide at a rate nearly four times the national average. What should business leaders do about it?

How to Attach a Patio Roof to an Existing House

A graceful integration may mean more work but improved functionality and aesthetics 

How To Improve Energy Performance in Existing Attics

There’s more to insulating the attic than attic insulation; there’s venting, air sealing, and misery

How to Install PVC Bevel Siding Over Rainscreen

It’s a lot like installing wood bevel siding, except it won’t warp or rot. And it expands and contracts differently and for different reasons

Understanding How PVC Trim Moves

Anybody who’s used PVC in an exterior application knows that it moves seasonally. Just like wood, right? Not exactly

To Vent or Not to Vent: A Discussion

In an attempt to strike a middle ground between high-performance and attainable, these three remodelers engage in a candid conversation

Ceiling Insulation and Installation at Model ReModel

Watch the building process of this accessory dwelling unit's vaulted ceiling 

Advertisement
boombox2 -
Advertisement
halfpage2 -
Advertisement
native1 -

More in Category




Advertisement
native2 -
Advertisement
halfpage1 -
Advertisement
leaderboard1 -