Level-Headed

Printer-friendly versionSend by email
September 01, 2009

 

Does the ability to achieve 200 percent or greater increase in allowable lateral resistance over traditional site-built garage fronts seem important to you? It should! iLevel by Weyerhaeuser's Garage Portal System incorporates the iLevel Shear Brace, TimberStrand LSL beam and a proprietary portal connection to achieve a 10 to 20 percent increase in allowable lateral resistance over two stand-alone braces. For FREE information, visit http://pb.hotims.com/23726-337

Comments on: "Level-Headed"

June 2015

This Month in Professional Remodeler

Products
Features

One bath used to be the rule, but these days one bath per bedroom is the trend. A second-floor addition is the answer, but it takes three tries to help clients work through the problem.

Email Subscriptions